advanced-ads
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/citybuzzclick/public_html/wp-includes/functions.php on line 6114Union Minister of Railways and Communication & Information Technology Ashwini Vaishnaw during his visit to Malkanagiri on Friday discussed about Malkanagiri- Bhadrachalam rail line project with railway officials and public representatives.
173.416 km long Malkanagiri-Bhadrachalam rail line project has been sanctioned by Railway Board on 9 September, 2021 with an estimated cost of Rs 2800 crore. This project will have 213 bridges including 48 major and 165 Minor bridges.
The proposed project will have Stations at Malkanagiri, Badali, Kowasiguda, Rajanguda, Maharajpalli and Lunimanguda in Odisha and Kannapuram, Kutugutta, Pallu, Nandigama, Bhadrachalam and Pandurangapuram in Telengana.
Estimated cost for conducting survey (FLS) is 307.64 lakhs sanctioned in January, 2022. Contract awarded on 27 February, 2022 for Rs 231 lakh. After studying various aspect of this project, the alignment has been finalised. Moreover, it is expected that by June, 2022, the survey works will be completed.
Govinda Poddar of Rest of Odisha-B scored 135 off 105 balls. (Photo credit: OCA) Cuttack:…
BBSR-A's Subhrakanta Parida returned figures of five for eight. (Photo credit: OCA) Cuttack: Subhrakanta Parida…
Tobacco awareness sessions organised by AMNS India in villages of Odisha. Bhubaneswar: In a significant…
Filmmaker Biswanath Rath at this year's Cannes Film Festival. Cannes/Bhubaneswar: Filmmaker Biswanath Rath has made…
Representational Image. (Image by Christop from Pixabay A recent study conducted by the Indian Institute…
Representational Image. (Image by Rosy / Bad Homburg / Germany from Pixabay) Chandigarh experienced its…